Availability All Editions
In some views in Meisterplan, you can easily edit cells and allocation values with your mouse and/or keyboard, the same way you already do in spreadsheet tools.
Shortcuts with your Mouse and Keyboard
| Actions | Shortcut |
| Switching between cells | Arrow keys (left, right) |
| Select multiple cells | Keyboard: click the first cell, and while holding down SHIFT + the desired arrow key, extend the selection to the left or the right |
| Mouse: click the first cell, and while left-clicking, drag the mouse to the left or right over the desired cells | |
| Copy selected cells | CTRL+C |
| Cut selected cells | CTRL+X |
| Paste selected cells | CTRL+V |
| Delete selected cell (single) | DELETE or the backspace button |
| Delete selected cells (multiple) | DELETE |
| Copying a cell to other cell(s) | Place the cursor at the bottom right corner of the cell with the desired value until it is shown as a hand. Then, while left-clicking, drag to the left or the right. |
| Undo (an) action(s) (only in the Team Planner) | Keyboard: CTRL+Z |
| Mouse: Click Undo in the Toolbar |
Copying, cutting and pasting cells can also work in combination with another spreadsheet tool, like Microsoft Excel or Google Sheets.
Availability
These shortcuts are available here:
- Team Planner's Time Grid Mode
- In the Allocations tab in the Project Details
- The Portfolio Budget section under Manage > Portfolios.