Minor Changes
Connected Tool Displayed in Project DetailsProPremium
You can now see the name of the linked tool in a project's details:
Last View Opened RemainsAll Editions
When logging into Meisterplan, you will always automatically open the last view you had opened. This saves you time and allows you to pick up right where you left off - without having to go through the Portfolio Designer first.
Resolved Issues
| Issue Number | Details | Date |
| 16350 |
There was an issue in the Portfolio Designer where the capacity in the histogram was displayed as 0 after changing the zoom level when a custom time period was selected in the settings. This issue has been resolved. |
2/25/2025 |
| 16537 |
There was an issue in the Power Automate Connector for Meisterplan where fields that the user did not have user rights for were set as required. This issue has been resolved. |
2/28/2025 |
| 16539 |
There was an issue in the Portfolio Designer where the view did not load when a custom time period was selected in the settings. This issue has been resolved. |
2/28/2025 |
| 16346 |
There was an issue in Quick Imports with the locale English (US) where short date formats were not recognized. This issue has been resolved. |
3/5/2025 |
| 16526 |
There was an issue in the My Schedule view where in some cases the My Schedule tile did not use the available space to display more projects. This issue has been resolved. |
3/1/2025 |
| 16511 |
There was an issue in the Import & Export view when switching between tiles where the import tiles sometimes flickered and could not be selected. This issue has been resolved. |
3/1/2025 |