Availability Premium
This article provides step-by-step instructions for uninstalling an on-premise instance of Meisterplan..
- Connect to the Meisterplan server and open a shell.
- The uninstaller will remove all databases and all files within the installation path. However, the directory "data" will not be deleted, as it contains backups, logs and configuration files.
- Double check that you saved all data (see Creating a Database Backup) and ensure that you are ready to uninstall.
- Execute
mpctl uninstall --yes.