Availability Premium
This article lists server system requirements for the on-premise installation of Meisterplan.
See also Client System Requirements.
Hardware (minimum)
- processor (CPU): 4 (v)CPUs
- available memory (RAM): 32 GB
- available disc space (HDD): 60 GB
Software
Operating System
- Linux Ubuntu 26.04 LTS 64-bit
- Debian 13 64-bit
- Red Hat Enterprise Linux (RHEL) 10.2 64-bit
Other Services
We recommend installing Meisterplan on a dedicated host or virtual machine with no other services running. The operation in a cluster environment (e.g., in a Kubernetes cluster) is currently not supported for Meisterplan on-premise installations.
Docker
The Docker container platform is required to set up and run the application. The following table provides links to the Docker installation instructions depending on your Linux distribution:
| Distribution | Installation of Docker-CLI |
| Ubuntu 26.04 LTS 64-bit | https://docs.docker.com/engine/install/ubuntu/ |
| Debian 13 64-bit | https://docs.docker.com/engine/install/debian/ |
| Red Hat Enterprise Linux (RHEL) 10.2 64-bit |
https://docs.docker.com/engine/install/rhel/ Please note that we do not support Podman as a container runtime.
|
We recommend using Docker v28 or higher to ensure a trouble-free experience with Meisterplan.
Email Server
Additionally, an email server with a working SMTP login is required in order to use some functionalities.