Report Chart Hint
We've added a new feature to the report charts: If you hover over a chart (e.g. a column), a hint will appear and show you more detailed information. The information displayed depends on the selected fields.
Single Sign On and Meisterplan Passwords
If a user tries to change their Meisterplan password and Single Sign On is enabled it won't be possible and a message will be displayed that the password can only be changed through their Identity Provider. If the Identity Provider is unavailable, the Administrators are still allowed to login via password. You can find the link to the login page on the Configure SAML page.
URL in Invitation Mails showing Instance Name
When adding new users the URL in the invitation email will now directly show the system URL including the instance name instead of the global login page URL.
Subscription Button
If you're using more resources than your licence allows, the button in the subscription menu will appear in red as a sign that you should upgrade your licence.
Solved Issues
Issue | Details | Date |
105952 |
If you lost your internet connection unexpectedly, you could be locked out from editing your project for one hour. This issue is now solved. |
07/04/2018 |
20761 |
If you tried to set the password expiration duration to zero you would be prompted to enter a value the next time you open the password settings. Now the number zero will be saved. |
07/04/2018 |
105359 |
If your session has timed out because of inactivity and you selected the option Keep me logged in, you would be prompted to login again. Now you will still be logged in after a page refresh. |
07/04/2018 |
105599 |
If too much data was added to the Allocations sheet in the Meisterplan Excel Template it took a long time to generate the AllocationMatrix. This performance issue has now been fixed. |
06/22/2018 |